Reach Out →
Residential and commercial framing work coordinated by SLM General Contractors
SLM General Contractors General Contracting Division

Framing services coordinated around the complete construction project, including walls, ceilings, openings, structural changes, additions, rough openings, trade access, inspections, and surrounding finish work.

Framing Services

Build the Structure. Define the Space. Support the Project.

SLM General Contractors provides framing services for residential, commercial, remodeling, addition, structural modification, and new-builds projects throughout Texas.

We evaluate existing structure, layout goals, wall and ceiling conditions, openings, loads, dimensions, trade pathways, access, scheduling, inspections, and connected construction before defining the work.

Primary Service Framing Construction and Project Coordination
Property Type Homes, Businesses, Remodels, Additions, and New Construction
Common Projects Walls, Ceilings, Openings, Additions, Structural Changes & Trade Coordination

Framing Services Overview

Strong Framing Starts with the Structure. Layout, Loads, Openings, and Trade Coordination All Matter.

Framing establishes the shape, support, and usable layout of a building. Walls, floors, ceilings, openings, structural members, backing, blocking, and tie-ins all need to be planned around the way the finished space will function and how later construction phases will connect to it.

Effective framing coordination begins with the existing structure or approved building plan, then accounts for dimensions, load paths, openings, utilities, access, inspections, material requirements, and the sequence in which the surrounding construction will be completed.

Framing and interior construction coordinated by SLM General Contractors
Framing rough-in coordinated with framing and interior construction
Framing Scope Development Existing structure, wall and ceiling conditions, openings, dimensions, loads, utilities, finish requirements, material needs, access, inspections, and project sequencing reviewed before work begins.

Framing is one of the earliest phases that determines how the rest of the project comes together. Wall locations, ceiling conditions, floor systems, structural supports, rough openings, backing, and blocking all influence the work that follows.

In remodeling and addition projects, framing may also require tying new construction into an existing structure, correcting previous work, modifying layouts, creating new openings, reinforcing damaged areas, or preparing spaces for new doors, windows, cabinetry, fixtures, and finishes.

The framing plan must also leave room for electrical, plumbing, HVAC, insulation, drywall, roofing, windows, doors, and other connected trades. Coordinating those needs before walls and ceilings are closed helps reduce conflicts, rework, and delays later in the project.

Structure and Existing Conditions

Review existing walls, floors, ceilings, framing members, openings, dimensions, support conditions, previous modifications, and visible damage before defining the framing scope.

Layout, Openings, and Structural Planning

Establish wall locations, ceiling lines, rough openings, headers, beams, posts, backing, blocking, and structural tie-ins around the intended layout and project requirements.

Trade Pathways and Construction Coordination

Coordinate framing with electrical, plumbing, HVAC, windows, doors, cabinetry, equipment, insulation, drywall, roofing, and finish work so later trades have the space and support they need.

Alignment, Inspection, and Readiness

Review alignment, fastening, bracing, openings, backing, blocking, structural connections, corrections, and inspection requirements before the project moves into enclosure and finish phases.

See the Framing Services We Coordinate
01
Residential Framing Build and modify walls, ceilings, openings, backing, blocking, structural assemblies, and layout changes for residential projects.
02
Commercial Framing Coordinate partitions, ceilings, openings, tenant layouts, backing, specialty framing, and phased construction for commercial properties.
03
Additions and Structural Changes Integrate new walls, floors, ceilings, roofs, openings, supports, and structural tie-ins with existing buildings and expanded spaces.
04
New-Construction Framing Coordinate floors, walls, ceilings, roof assemblies, openings, structural components, inspections, and trade readiness from the ground up.

Framing Services

Framing Service Capabilities Coordinated as Parts of One Complete Structural and Construction Project.

A framing project may involve one focused room or several overlapping construction phases. Existing flooring, subfloor conditions, moisture, materials, transitions, cabinetry, trim, access, occupancy, and project priorities all influence how the work should be organized.

The flooring scope is built around the actual property and intended use, not a generic package. Each project requires its own combination of evaluation, removal, substrate preparation, moisture review, material planning, installation, transitions, trim, protection, cleanup, and closeout.

01

Residential Wall and Interior Framing

Coordinate interior and exterior wall framing for home renovations, additions, room changes, new openings, partitions, and structural improvements around the complete residential plan.

  • Interior and exterior wall framing
  • Room divisions and layout changes
  • Door and window rough openings
  • Backing, blocking, and finish support
02

Commercial Partition and Build-Out Framing

Coordinate partitions, ceilings, openings, backing, tenant layouts, and interior framing for offices, retail spaces, commercial suites, and phased build-outs.

  • Office and tenant partitions
  • Retail and customer-facing layouts
  • Ceiling, soffit, and bulkhead framing
  • Occupied-property and phased construction
03

Structural Framing and Modifications

Coordinate framing associated with structural changes, enlarged openings, reinforcement, load transfer, additions, damaged areas, and modifications affecting the building’s primary assemblies.

  • Structural wall and opening coordination
  • Headers, beams, and support framing
  • Reinforcement and corrective framing
  • Integration with engineered requirements
04

Additions and Expansion Framing

Build framing for new rooms, living areas, offices, expansions, and attached structures while coordinating foundations, floors, walls, roofs, openings, utilities, and existing-building tie-ins.

  • Floor, wall, and roof framing
  • Existing-structure tie-ins
  • Door, window, and utility openings
  • Weather protection and sequencing
05

Ceilings, Soffits, and Specialty Framing

Frame ceilings, drops, soffits, chases, niches, bulkheads, equipment surrounds, and architectural features that define the finished space and support connected systems.

  • Flat, dropped, and framed ceilings
  • Soffits, chases, and bulkheads
  • Niches and architectural features
  • Mechanical and finish coordination
06

Openings, Blocking, and Backing

Coordinate rough openings, blocking, backing, nailers, supports, and attachment surfaces for doors, windows, cabinets, railings, fixtures, equipment, wall finishes, and specialty installations.

  • Door and window rough openings
  • Cabinet and fixture backing
  • Equipment and railing support
  • Finish and specialty-installation preparation
07

Remodeling and Corrective Framing

Address layout changes, damaged framing, incomplete prior work, altered openings, walls, ceilings, floors, and corrective conditions discovered during demolition or renovation.

  • Framing repairs and corrections
  • Wall removal and reconfiguration
  • Damaged or incomplete areas
  • Integration with remodeling phases
08

New-Construction Framing

Manage framing sequencing for new residential and commercial construction from material delivery and layout through floors, walls, ceilings, roofs, openings, inspections, and trade readiness.

  • Complete structural framing sequence
  • Floor, wall, ceiling, and roof assemblies
  • Rough openings and trade pathways
  • Inspection and enclosure readiness

Framing Service Applications

Different Properties and Project Phases Require Different Framing Planning and Installation Strategies.

Framing services may support an occupied home, operating business, remodeling project, addition, tenant improvement, or new building. The plan must reflect existing conditions, power demand, layout, equipment, access, inspections, finishes, schedule, and connected trades.

Residential wall framing coordinated with home remodeling
Project Type 01

Residential Remodeling and Interior Framing

Residential framing may involve new walls, removed walls, altered openings, ceiling changes, backing, blocking, structural corrections, or complete layout reconfiguration within an existing home.

The framing plan is coordinated with household access, demolition, structure, electrical, plumbing, HVAC, doors, cabinetry, insulation, drywall, trim, and the sequence of surrounding renovation work.

  • Wall and layout modifications
  • Door and window openings
  • Backing, blocking, and ceiling framing
  • Occupied-home protection and scheduling
Request Residential Framing Service
Commercial partition framing in an office or tenant space
Project Type 02

Commercial Partitions and Tenant Build-Outs

Commercial framing defines offices, retail areas, tenant suites, corridors, support spaces, ceilings, openings, equipment areas, and customer-facing layouts within new or existing properties.

The project is organized around business continuity, safe access, partition layout, ceiling conditions, doors, storefronts, utilities, inspections, drywall, finishes, and phased completion.

  • Office and tenant partition framing
  • Retail and customer-facing layouts
  • Ceilings, soffits, and equipment areas
  • Phased and occupied-property construction
Request Commercial Framing Service
Addition framing coordinated with structural and finish work
Project Type 03

Home and Commercial Additions

Addition framing connects new floors, walls, ceilings, roofs, openings, and structural assemblies to the existing building while creating usable new space and preserving the intended layout.

The framing sequence must coordinate foundation readiness, structural tie-ins, temporary protection, utilities, roofing, exterior enclosure, windows, doors, inspections, and later interior finishes.

  • Floor, wall, and roof framing
  • Structural tie-ins and openings
  • Utility and trade pathways
  • Weather protection and enclosure sequencing
Discuss Addition Framing
New construction structural framing and project coordination
Project Type 04

New Residential and Commercial Construction

New construction framing establishes the primary form, layout, dimensions, openings, and support conditions for the entire building and every trade that follows.

The framing schedule is coordinated with foundations, material deliveries, floors, walls, ceilings, roofs, sheathing, openings, bracing, inspections, utilities, enclosure, and trade readiness.

  • Complete structural framing sequence
  • Floor, wall, ceiling, and roof assemblies
  • Openings, blocking, and trade access
  • Inspection and enclosure preparation
Plan New-Construction Framing

Our Framing Services Process

An Framing Coordination Process. Built Around Evaluation, Layout, Construction, Coordination, and Final Review.

Framing service begins by understanding the property and intended use, reviewing existing conditions, defining power and lighting needs, coordinating rough-in with construction, completing fixtures and devices, and preparing the system for inspection and operation.

01

Project Goals and Framing Needs

We begin by discussing the property, intended use, existing flooring concerns, material preferences, traffic, moisture exposure, maintenance goals, timeline, construction scope, and whether the work is residential, commercial, remodeling, new construction, or a general improvement.

02

Existing Structure and Framing Assessment

The team evaluates accessible flooring, subfloor conditions, movement, damage, flatness, moisture exposure, transitions, stairs, doors, cabinetry, trim, access, finishes, and the relationship between framing work and surrounding construction.

03

Framing Planning and Rough-In Coordination

We organize layouts, dimensions, lumber and framing materials, openings, blocking, backing, structural coordination, demolition, protection, trade pathways, inspections, and construction sequencing.

04

Framing Construction and Trade Integration

The approved work may include flooring removal, adhesive and fastener cleanup, leveling, underlayment, localized subfloor correction, material installation, stairs, transitions, thresholds, trim, corrective conditions, and coordination with cabinetry, doors, fixtures, walls, and finishes.

05

Final Alignment, Inspection, and Project Closeout

We review installed flooring, seams, layout, transitions, edges, trim, stairs, cleanup, protection, visible finish details, remaining items, and any future flooring or construction phases.

Framing work being reviewed as part of a construction project

Frequently Asked Questions

Framing Services FAQs Helpful Answers About Residential, Commercial, Remodeling, and New-Construction Framing Work.

SLM General Contractors can provide or coordinate wall framing, ceiling framing, partitions, openings, backing, blocking, additions, structural modifications, corrective framing, and complete framing for residential and commercial construction projects.

The exact scope depends on the existing structure, intended layout, required openings, connected utilities, finish requirements, engineering or permit needs, and whether the work is part of a remodel, addition, build-out, repair, or new build.

  • Residential and commercial framing
  • Walls, ceilings, openings, and partitions
  • Additions and structural modifications
  • Remodeling and new-builds coordination

Helpful Resources: International Code Council • APA – The Engineered Wood Association

Some walls can be removed or altered, but the work should not begin until the wall’s role, connected loads, utilities, surrounding framing, and required support are understood. An opening may require a header, beam, posts, reinforcement, temporary support, or engineered direction.

The framing plan should also account for electrical, plumbing, HVAC, drywall, flooring, ceilings, cabinetry, and finishes affected by the change. Structural and permit requirements vary by project and jurisdiction.

  • Determine whether the wall carries load
  • Review utilities and surrounding framing
  • Coordinate temporary and permanent support
  • Plan repairs to adjoining finishes

Helpful Resources: International Code Council • APA – The Engineered Wood Association

Framing establishes the walls, ceilings, floors, openings, chases, and spaces through which electrical, plumbing, and HVAC systems must pass. Accurate coordination helps preserve structural members while providing practical routes and required clearances.

Trade needs should be reviewed before enclosure so boxes, pipes, ducts, equipment, vents, fixtures, and access panels do not conflict with framing, blocking, headers, or finished layouts.

  • Plan pathways before walls close
  • Coordinate chases, openings, and equipment areas
  • Provide required backing and support
  • Sequence rough-ins and inspections

Helpful Resources: OSHA Construction Safety • International Code Council

Many framing projects can be completed in occupied properties, depending on the scope, demolition, dust, noise, structural work, access, temporary support, utility relocation, safety conditions, and the areas affected.

The project should establish protected work zones, access routes, debris handling, temporary barriers, shutdown windows, and which rooms or business areas may be unavailable. Larger projects may be completed in phases.

  • Protected work and occupied zones
  • Defined contractor and occupant access
  • Dust, debris, and safety planning
  • Phased scheduling when appropriate

Helpful Resources: OSHA Construction Safety • EPA Indoor Air Quality

Inspection timing depends on the project and local requirements, but framing is commonly reviewed after the structural assemblies and rough openings are in place and before insulation, drywall, or other finishes conceal the work.

Electrical, plumbing, mechanical, fire-blocking, and other rough-in requirements may need to be coordinated before enclosure. The construction schedule should allow required reviews and corrections without disrupting later phases.

  • Complete required structural framing
  • Coordinate rough-in trade inspections
  • Keep framing accessible for review
  • Resolve corrections before enclosure

Helpful Resources: International Code Council • Texas Department of Licensing and Regulation