New roof installation in progress by SLM General Contractors
SLM General Contractors Roofing Division

New roof systems planned around the structure, roofing material, water movement, ventilation, flashing, penetrations, drainage, and long-term building protection.

New Roof Installation

Build the Roof Correctly From the Structure Up.

SLM General Contractors installs complete roofing systems for new construction, additions, major renovations, detached structures, residential properties, and commercial buildings throughout McKinney and North Texas.

We coordinate the roof deck, underlayment, moisture protection, roofing material, flashing, ventilation, penetrations, edges, valleys, drains, gutters, and transitions so each component supports the performance of the finished roof.

Project Type New Roof Installation
Property Types Residential, Commercial, Additions & Detached Structures
Complete System Decking, Underlayment, Roofing, Flashing, Ventilation & Drainage

New Roof Installation Overview

A Dependable New Roof Begins With Coordination Before the First Material Is Installed.

A new roof is a layered building system rather than a single exterior finish. Framing, roof decking, underlayment, water barriers, roofing materials, flashing, ventilation, drainage, and penetrations must be planned in the correct sequence.

SLM General Contractors reviews the roof design together with adjoining walls, additions, equipment, chimneys, vents, valleys, ridges, edges, gutters, drains, and other transitions before installation begins.

New roof system being installed over prepared roof decking
Completed new roof installation by SLM General Contractors
Complete Roof-System Construction Structural preparation, moisture protection, roofing materials, flashing, ventilation, drainage, and edge details coordinated within one installation plan.

New roof installation provides the opportunity to build each layer around the actual structure instead of adapting new materials to unresolved conditions left behind by an older roof system.

The installation must account for roof pitch, framing, decking, material fastening, water-shedding patterns, low-slope areas, valleys, wall intersections, penetrations, attic conditions, mechanical equipment, and the way runoff leaves the building.

Depending on the project, the work may involve a new home, commercial building, home addition, detached garage, accessory structure, substantial remodel, structural expansion, or replacement project where the roof assembly is being rebuilt from the deck upward.

Roof Design and Geometry

Coordinate slopes, ridges, hips, valleys, crickets, walls, transitions, overhangs, and drainage paths before installation.

Layered System Construction

Install decking, underlayment, moisture barriers, roofing materials, flashing, and edges in the proper construction sequence.

Ventilation and Moisture Management

Coordinate attic intake, exhaust, insulation, interior exhaust, and roof ventilation with the completed roof assembly.

Drainage and Water Direction

Move runoff through valleys, edges, gutters, downspouts, drains, scuppers, and overflow paths without concentrating water at vulnerable building transitions.

See What New Roof Installation Can Include
01
New Construction Roofing Install a complete roof system for a newly constructed residential or commercial building.
02
Addition and Expansion Roofing Build a new roof area and coordinate its connection with the slopes, walls, and drainage of the existing property.
03
Complete Roof-System Rebuilds Reconstruct the roofing assembly from the prepared deck upward when the project requires more than a surface replacement.
04
Detached and Accessory Structures Install coordinated roofing for garages, workshops, outbuildings, covered areas, and other separate structures.

What We Handle

The Components of a New Roof Coordinated Within One Complete Installation Plan.

A successful roof installation depends on the work beneath, beside, and through the finished roofing surface. Structural preparation, water barriers, ventilation, penetrations, flashing, drainage, and edge details can all affect performance.

SLM General Contractors coordinates those connected components within one defined scope so the completed roof functions as a complete building-protection system.

01

Roof Layout and Installation Planning

Review roof geometry, slope, material requirements, transitions, penetrations, access, staging, and drainage before materials are installed.

  • Roof-plan and slope review
  • Valley, ridge, hip, and edge coordination
  • Material and fastening requirements
  • Installation sequencing and access planning
02

Roof Decking and Structural Surface

Prepare the continuous roof surface that supports underlayment, roofing materials, fasteners, flashing, and the loads placed on the completed assembly.

  • Decking installation and preparation
  • Damaged or unsuitable panel replacement
  • Surface fastening and alignment review
  • Openings and penetration preparation
03

Underlayment and Moisture Protection

Install secondary water-management layers beneath the visible roof material, with added attention at valleys, eaves, penetrations, walls, and other vulnerable areas.

  • Roof underlayment installation
  • Eave and valley protection
  • Wall and penetration preparation
  • Material-compatible moisture barriers
04

Roofing Material Installation

Install the selected roofing material according to the roof design, manufacturer requirements, fastening pattern, slope, exposure, and adjoining roof details.

  • Material layout and alignment
  • Fastening and attachment
  • Ridges, hips, seams, and terminations
  • Transitions between roof areas
05

Flashing and Roof Penetrations

Protect the interruptions in the roof surface where water must be directed around walls, chimneys, pipes, vents, skylights, curbs, and equipment.

  • Wall and step flashing
  • Chimney and skylight detailing
  • Pipe, vent, and equipment penetrations
  • Valley and transition flashing
06

Roof and Attic Ventilation

Coordinate intake and exhaust ventilation with roof geometry, attic configuration, insulation, interior exhaust systems, and the selected roofing assembly.

  • Intake and exhaust planning
  • Ridge and roof vent installation
  • Attic airflow coordination
  • Interior exhaust termination review
07

Roof Edges, Fascia, and Terminations

Complete the perimeter and termination details that protect roof edges, support drainage, resist wind exposure, and connect the roof with exterior wall assemblies.

  • Drip edge and perimeter metal
  • Fascia and roof-edge coordination
  • Parapet and termination details
  • Wind-exposed edge preparation
08

Gutters, Drains, Scuppers, and Runoff

Collect and direct roof runoff through the drainage approach appropriate for the building, roof geometry, edges, entrances, landscaping, and surrounding property.

  • Gutter and downspout coordination
  • Commercial drains and scuppers
  • Overflow and discharge planning
  • Runoff direction at the property

New Roof Installation Services

New Roof Systems Built Around the Structure, Property Type, and Intended Use.

New roof installation can support a newly constructed building, an addition, a detached structure, or a major reconstruction project. SLM General Contractors develops the scope around the roof geometry, property use, material system, connected trades, and long-term protection required.

New residential roof installation in progress
Project Type 01

New Residential Roof Installation

New homes require roofing that integrates with framing, attic ventilation, insulation, exterior walls, chimneys, vents, plumbing penetrations, gutters, and the architectural form of the property.

Our team coordinates roof preparation, underlayment, flashing, roofing materials, valleys, ridges, edges, ventilation, and drainage so the completed system protects the home from the start.

  • New custom and production homes
  • Steep-slope residential roofs
  • Complex hips, valleys, and rooflines
  • Ventilation and gutter coordination
Plan a Residential Roof Installation
Completed new commercial roof installation
Project Type 02

New Commercial Roof Installation

Commercial buildings often require roofing coordinated with insulation, low-slope drainage, equipment curbs, vents, conduits, drains, scuppers, parapets, roof access, and future maintenance.

We organize the installation around the building plan, rooftop systems, material requirements, sequencing, access, operations, and the long-term service needs of the property.

  • Office and retail buildings
  • Warehouses and industrial properties
  • Low-slope and mixed-slope assemblies
  • Equipment, drains, and edge details
Plan a Commercial Roof Installation
New roofing installed over a home or commercial addition
Project Type 03

Additions and Structural Expansions

Additions require a new roof area to connect with an existing building without creating vulnerable transitions, trapped runoff, mismatched slopes, undersized drainage, or poorly integrated walls.

We coordinate framing relationships, tie-in locations, valleys, flashing, walls, roofing materials, ventilation, gutters, and runoff so the addition becomes part of one connected envelope.

  • Home additions and expanded living areas
  • Commercial building expansions
  • Existing-to-new roof transitions
  • Valley, wall, and drainage integration
Discuss an Addition Roof
New roof installation on detached garage or accessory structure
Project Type 04

Garages, Workshops, and Detached Structures

Detached buildings still require a complete roofing system suited to their construction, interior use, ventilation, exposure, drainage, and proximity to surrounding structures.

We install roofing for garages, workshops, storage buildings, covered areas, accessory structures, and other standalone improvements using the same system-based planning applied to larger residential and commercial projects.

  • Detached garages and workshops
  • Storage and accessory buildings
  • Covered outdoor structures
  • Coordinated gutters and drainage
Plan Roofing for a Detached Structure

Our New Roof Installation Process

A Coordinated Installation Process. Built Around Planning, Sequencing, and Quality Review.

New roof installation requires coordination between structure, decking, moisture protection, roofing materials, ventilation, flashing, penetrations, drainage, exterior finishes, and other connected trades. Each phase is organized before the next layer conceals the work beneath it.

01

Consultation and Project Review

We begin by reviewing the property type, roof design, construction schedule, intended roofing material, connected trades, penetrations, drainage approach, access, and the broader goals of the building project.

02

Roof-System Planning

Our team coordinates decking, underlayment, moisture protection, material layout, flashing, ventilation, ridges, valleys, edges, penetrations, gutters, drains, scuppers, and transitions.

03

Preparation and Connected Trade Coordination

Before installation, we review the roof surface, openings, curbs, vents, pipes, equipment, walls, exterior finishes, scheduling, deliveries, staging, access, and conditions required for roofing work to proceed.

04

New Roof Installation

The team completes the approved decking preparation, underlayment, water barriers, roofing materials, flashing, ventilation, edge details, drainage components, penetrations, cleanup, and related scope items.

05

Final Review

Before completion, we review finished roofing areas, flashing, penetrations, valleys, ridges, roof edges, ventilation, gutters or drains, transitions, cleanup, and remaining installation details.

New roof installation by SLM General Contractors

Frequently Asked Questions

New Roof Installation FAQs Helpful Answers Before Building a Complete Roof System.

A complete installation may include roof decking preparation, underlayment, water barriers, roofing materials, flashing, ventilation, ridges, valleys, penetrations, edge metal, gutters, drains, scuppers, and other components required by the building and roof design.

The exact scope depends on whether the project is residential or commercial, the roof geometry, selected material, connected equipment, drainage approach, and the condition of the structure receiving the new roof.

  • Review the roof design and supporting surface.
  • Define each material layer before installation.
  • Coordinate flashing, penetrations, and drainage.
  • Confirm ventilation and edge details.

Helpful Resources: Whole Building Design Guide • U.S. Department of Energy Roofing

New roof installation commonly refers to roofing a newly constructed structure, addition, or major reconstruction, while replacement usually begins with removal or recovery of an existing roof system. Both require coordinated layers, but replacement must also account for concealed conditions and materials left by the previous roof.

Some projects fall between those categories, especially when an existing roof is removed and the assembly is rebuilt from the deck upward as part of structural or building-envelope work.

  • New installation begins with a new or prepared structure.
  • Replacement involves an existing roof assembly.
  • Both require flashing and drainage coordination.
  • Structural changes may turn replacement into a full rebuild.

Helpful Resources: National Roofing Contractors Association • FEMA Roofing Guidance

Each penetration interrupts the continuous roofing surface and requires detailing that directs water around the opening. The roof must be coordinated with curbs, framing, clearances, flashing, counterflashing, underlayment, and the installation sequence of the connected component.

Planning those details before roofing begins reduces the need to cut into completed work or rely on improvised surface seals after the surrounding roof has already been installed.

  • Confirm opening and curb locations in advance.
  • Coordinate flashing with the roofing material.
  • Review clearances and service access.
  • Sequence connected trades before final roofing details.

Helpful Resources: Whole Building Design Guide • International Code Council Codes

Ventilation and insulation influence heat flow, attic conditions, interior comfort, moisture movement, and the environment beneath the roof assembly. Their design should align with the building type, roof geometry, climate, interior use, and mechanical systems.

Reviewing these systems early helps avoid blocked intake, unbalanced exhaust, misplaced interior vents, or insulation conditions that interfere with airflow and moisture management.

  • Coordinate intake and exhaust openings.
  • Keep insulation from blocking ventilation paths.
  • Review bathroom and kitchen exhaust termination.
  • Match the approach to the roof and building design.

Helpful Resources: U.S. Department of Energy Ventilation • EPA Indoor Air Quality

Roofing coordination is most effective before framing, decking, penetrations, equipment curbs, exterior walls, and drainage details are finalized. Early involvement allows roof transitions and material requirements to be reviewed before they become field conflicts.

The contractor can also help coordinate access, staging, delivery timing, weather protection, connected trades, and the sequence required to keep the building protected while construction continues.

  • Review roof geometry before framing is complete.
  • Confirm penetrations and equipment locations early.
  • Coordinate drainage and exterior transitions.
  • Plan installation around the construction schedule.